Last Modified: 11-29-2007 1.6 A
Service Category: Engine/Hybrid System Section: Emission Control
Model Year: 2008 Model: Sequoia Doc ID: RM000002Y57005X
Title: 2UZ-FE EMISSION CONTROL: PCV VALVE: INSTALLATION (2008 Sequoia)

INSTALLATION

1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


(a) Apply adhesive to 2 or 3 threads.

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent


(b) Install the ventilation valve sub-assembly.

Torque: 27 N·m (275 kgf·cm, 20 ft·lbf)

HINT:

After applying the specified torque, rotate the ventilation valve clockwise with the port faced in the direction indicated in the illustration.

2. INSTALL VENTILATION VALVE COVER

3. CONNECT VENTILATION HOSE